Türkçe
|
English
Photo
Customer
Project
Location
Amount
Date
More
MUTUAL TELECOM INC.
STEEL STRUCTURED BUILDING CONSTRUCTION WITH BALLSITIC SHIELD AND POWER SYSTEM
IRAQ
$834,930.80
18.08.2008
332 ECONS BALAD AIR BASE/IRAQ
CONSTRUCT INFIELD ACCESS ROAD – LSA ANACONDA
BALAD/IRAQ
$819,497.00
28.03.2007
RCC BALAD AIR BASE, BALAD/ IRAQ(AIR FORCE)
30 DRY TRAILERS
BALAD/IRAQ
$594,000.00
21.07.2008
RCC
REPAIR WING OPERATIONS CENTER,BLDG 4020
BALAD/IRAQ
$527,419.00
08.10.2007
39tH CONS/LGCS
REPAIR STORM DRAINAGE SYSTEM
IRAQ
$512,144.00
12.03.1999
447 AEG/ECONS SATHER AIR BASE, BAGHDAD INT. AIRPORT, IRAQ
PASSENGER TERMINAL CONCRETE
BAGHDAD/IRAQ
$342,257.00
15.06.2009
KBR INT. INC.
DESIGN AND CONSTRUCTION OF LIFT STATION
JOINT BASE BALAD/IRAQ
$333,090.16
30.08.2009
Northrop Grumman Space &Mission Systems Corp
MDN&MDF INSTALLATION
BAGHDAD/IRAQ
$317,000.00
28.09.2009
JCC-I/A VICTORY RCC 447 AEG/ECONSS SATHER AIR BASE APO AE 09321
PAX TERMINAL SUNSHADE
BAGHDAD/IRAQ
$235,000.00
22.10.2009
IAP WORLDWIDE SERVICES,INC.
MOTORPOOL STORAGE FACILITY
BAGHDAD/IRAQ
$163,348.00
28.03.2009
<<
<
1
2
3
4
>
>>
Copyright © 2009 | PIRIL Co.
Design by Interkey
Kurumsal
Kalite Politikamız
Üyeliklerimiz
Projeler
Makine Parkı
Pırıl Co. İletişim
Pırıl Co.
Quality Policies
Memberships
Projects
Equipment List
Pırıl Co. İletişim